Object Number2024.09.03.02
TitleSPH2 Strobic exhaust fan replacement: project close-out materials
DescriptionMaterials for this project have been received by the PIRC and are not yet fully cataloged, but may be made available to patrons upon request. Please contact PIRC staff for more information.Date2024
Firm
WSP
Building/Site(s):
Project NumberSPH 2022-0062
Project NameSPH2 Strobic exhaust fan replacement
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
Extent
12 drawings + related documentation
Object Number: 2024.09.03.01
Date: 2024
Project Number: SPH 2022-0036
Sites:
SPH Building 2
Project Name: SPH2 AHU 212 & 211 replacement
Object Number: 2023.07.21.03
Date: 2022
Project Number: SPH 2022-0042
Sites:
SPH Building 2
Project Name: SPH 2 IID Virology Lab
Object Number: 2025.02.21.01
Date: 2024
Project Number: SPH 2024-0298
Sites:
SPH Building 1
Project Name: SPH 1 roof replacement
Object Number: 2023.07.06.08
Date: 2021
Project Number: SEAS 2021-0027
Sites:
Allston Science and Engineering Complex
Project Name: Faculty dry lab fit-out Walsh ATI (replacement Wyss lab)
Object Number: 2025.05.02.01
Date: 2024
Project Number: SPH 2022-0222
Sites:
SPH Building 1
Project Name: SPH1 main electric panel
Object Number: 2024.03.18.01
Date: 2023
Project Number: FCOR 2020-0168
Sites:
Memorial Hall
Project Name: Memorial Hall slate roof replacement phase 2
Object Number: 2024.03.18.04
Date: 2023
Project Number: FCOR 2022-0086
Sites:
Memorial Hall
Project Name: Memorial Hall slate roof replacement phase 3
Object Number: 2025.04.02.01
Date: 2021
Project Number: SEAS 2021-0215
Sites:
Gordon McKay Laboratory
Project Name: Renewal - McKay hot water pipe replacement phase 2
Object Number: 2024.10.01.01
Date: 2024
Project Number: HLS 2020-0127
Sites:
Hastings Hall
Project Name: Hastings Hall heat exchanger replacement
Object Number: 2025.04.21.02
Date: 2024
Project Number: FCOR 2024-0051
Sites:
Memorial Hall
Project Name: Memorial Hall fire alarm equipment replacement
Title:
Smith Campus Center 10th floor patio window system replacement: CAPS project close-out materials
Object Number: 2023.05.19.01
Date: 2023
Project Number: HRES 2023-0091
Sites:
Smith Campus Center
Project Name: Smith Campus Center 10th floor patio window system replacement
Object Number: 2021.11.15.01
Date: 2019
Project Number: FCOR 2019-0143
Sites:
Biological Laboratory
Project Name: Biology HVAC [heating, ventilation, and air conditioning] system replacement, phase 3