Skip to main content
Gund Hall fifth floor sprinkler system: CAPS project close-out materials
Image Not Available for Gund Hall fifth floor sprinkler system: CAPS project close-out materials

Object Number2016.02.04.02

TitleGund Hall fifth floor sprinkler system: CAPS project close-out materials
DescriptionMaterials for this project have been received by the PIRC and are not yet fully cataloged, but may be made available to patrons upon request. Please contact PIRC staff for more information.
Date2016
Building/Site(s):
Project NameGund Hall fifth floor sprinkler system
Project NumberGSD 2015-0152
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
Extent1 drawing
Object Number: 2023.12.07.02
Date: 2023
Project Number: GSD 2023-0255
Sites: Gund Hall
Project Name: Gund 111 modernization
Object Number: 2023.12.07.01
Date: 2023
Project Number: GSD 2023-0129
Sites: Gund Hall
Project Name: Gund Hall 109 modernization
Object Number: 2017.04.11.02
Date: 2016
Project Number: HRES 2015-0059
Sites: 16 Prescott Street
Project Name: Priority 3 wood frame sprinklers phase 4
Object Number: 2017.10.25.01
Date: 2017
Project Number: HRES 2015-0059
Sites: 17 Ware Street
Project Name: Priority 3 wood frame sprinklers phase 4
Object Number: 2021.03.31.05
Date: 2017
Project Number: FGS 2017-0188
Sites: Child Hall
Project Name: Child Hall electrical system upgrade
Object Number: 2009.11.23.01
Date: 2008
Project Number: FCOR 2008-0416
Sites: Northwest Building
Project Name: Northwest Labs floor four north systems biology phase 2
Object Number: 2023.05.19.01
Date: 2023
Project Number: HRES 2023-0091
Project Name: Smith Campus Center 10th floor patio window system replacement
Object Number: 2021.11.15.01
Date: 2019
Project Number: FCOR 2019-0143
Sites: Biological Laboratory
Project Name: Biology HVAC [heating, ventilation, and air conditioning] system replacement, phase 3
Object Number: 2023.03.02.01
Date: 01/06/2023
Project Number: SPH 2022-0047
Sites: SPH Building 1
Project Name: SPH1 cage neutralization system / chilled water pump
Object Number: 2023.01.31.02
Date: 2021
Project Number: FATH 2021-0068
Sites: Dillon Field House
Project Name: Dillon fire alarm system renewal
Object Number: 2014.03.14.01
Date: 2013
Project Number: SEAS 2013-0030
Sites: Northwest Building
Project Name: Northwest Building Aizenberg laboratory fit-out
Object Number: 2023.07.06.08
Date: 2021
Project Number: SEAS 2021-0027
Project Name: Faculty dry lab fit-out Walsh ATI (replacement Wyss lab)