Skip to main content
Science Center emergency generator replacement: project close-out materials
Image Not Available for Science Center emergency generator replacement: project close-out materials

Object Number2025.04.16.02

TitleScience Center emergency generator replacement: project close-out materials
DescriptionMaterials for this project have been received by the PIRC and are not yet fully cataloged, but may be made available to patrons upon request. Please contact PIRC staff for more information.
Date2023
Building/Site(s):
Project NumberFCOR 2023-0160
Project NameScience Center emergency generator replacement
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
Extent 144 drawings
Object Number: 2024.07.16.01
Date: 2022
Project Number: FCOR 2023-0125
Sites: Science Center
Project Name: Science Center accessibility improvements program (year 1)
Object Number: 2025.04.07.01
Date: 2023-2025
Project Number: FCOR 2020-0122
Sites: Science Center
Project Name: Science Center lecture hall A, B study
Object Number: 2023.05.19.01
Date: 2023
Project Number: HRES 2023-0091
Sites: Smith Campus Center
Project Name: Smith Campus Center 10th floor patio window system replacement
Object Number: 2023.07.05.08
Date: 2020
Project Number: HRES 2021-0135
Sites: Cronkhite Center
Project Name: Cronkhite Graduate Center partial roof replacement
Object Number: 2025.02.12.01
Date: 2021
Project Number: HRES 2021-0145
Sites: Spangler Center
Project Name: Spangler Center dishwasher and tray return replacement
Object Number: 2021.03.31.02
Date: 2018
Project Number: FGS 2018-0243
Sites: Smith Campus Center
Project Name: Smith Campus Center, Graduate School of Arts and Sciences office renewal
Object Number: 2023.07.06.08
Date: 2021
Project Number: SEAS 2021-0027
Sites: Allston Science and Engineering Complex
Project Name: Faculty dry lab fit-out Walsh ATI (replacement Wyss lab)
Object Number: 2024.03.18.01
Date: 2023
Project Number: FCOR 2020-0168
Sites: Memorial Hall
Project Name: Memorial Hall slate roof replacement phase 2
Object Number: 2024.03.18.04
Date: 2023
Project Number: FCOR 2022-0086
Sites: Memorial Hall
Project Name: Memorial Hall slate roof replacement phase 3
Object Number: 2024.09.03.01
Date: 2024
Project Number: SPH 2022-0036
Sites: SPH Building 2
Project Name: SPH2 AHU 212 & 211 replacement
Object Number: 2024.09.03.02
Date: 2024
Project Number: SPH 2022-0062
Sites: SPH Building 2
Project Name: SPH2 Strobic exhaust fan replacement
Object Number: 2025.04.02.01
Date: 2021
Project Number: SEAS 2021-0215
Sites: Gordon McKay Laboratory
Project Name: Renewal - McKay hot water pipe replacement phase 2